1-1/2" Scale GE 44 Ton Construction

The hard working 44 tonner with load. Built for track maintenance, she has far exceeded all expectations. The handheld control is on the cab roof.

Trucks

-->Click on a thumbnail to view a larger image.<--

Main side plates are 1/2" steel, equalizers are 1/4" steel, journal boxes are aluminum, steel wheels hogged from solid billet, and springing.
Main side plates are 1/2" steel, equalizers are 1/4" steel, journal boxes are aluminum, steel wheels hogged from solid billet, and springing.
Remove bolts on right hand side, insert two half circles of 1/4" brass as spacers and retighten bolts. This changes the gauge from 7-1/4" to 7-1/2".
Remove bolts on right hand side, insert two half circles of 1/4" brass as spacers and retighten bolts. This changes the gauge from 7-1/4" to 7-1/2".
Front showing provision for moving left wheel out 1/4" to achieve 7-1/4" or 7-1/2" gauge operation.
Front showing provision for moving left wheel out 1/4" to achieve 7-1/4" or 7-1/2" gauge operation.
No caption yet
No caption yet

View More